01 / Contact

Request a survey before any quote

Tell us the address, the floor area in m², and the rooms you want changed. We reply with two survey slots within three working days across Kyiv and the surrounding region.

Cost band noteBands are typical ranges, not fixed prices; fees are quoted after survey.

  1. 01
    Send the briefOne short form. Include the address, area in m², building type and target date.
  2. 02
    Site survey60 to 90 minutes on location. We measure, check services and photograph existing conditions.
  3. 03
    Scope sheetDelivered within five working days, followed by the cost band and material ledger.

Studio details, registration and insurance records sit on the contact details panel below.

Send your renovation brief

Tell us the property, the area and when you would like work to start. We answer with a scope sheet, a cost band and the next available survey slot.

We reply within two working days. Studio line: +380 665 164 5316.

04 Contact details

Studio register

Where the studio works from

Surveys, measurements and material selections are booked from the Velyka Vasylkivska studio. Written enquiries receive a reply within one working day.

Studio address
42 Velyka Vasylkivska St, Kyiv, 01004, Ukraine
Telephone
+380 665 164 5316
Service area
Kyiv and the surrounding oblast, including Irpin, Bucha and Brovary. Sites beyond 60 km are quoted with travel listed as a separate line.
Studio hours
Monday to Friday, 09:00 to 18:00. Site surveys are scheduled on Thursdays and Fridays.
Registration
orbiktdarshot.com, LLC. EDRPOU 69141341. Single tax payer; VAT optional.

Prefer to start from figures? Review the published cost bands or send your scope sheet.

05

Client notes

What clients recorded after handover

Notes from projects finished between 2023 and 2025. Each entry lists the apartment area, the build duration and the cost band agreed in the scope sheet.

  • “Every wall we planned to move was on the scope sheet before the first hammer went in. When the load-bearing column needed a steel frame, the revised line item reached us the same week.”

    Olena KravetsPechersk, Kyiv78 m²14 weeksBand 1.4–1.6 M UAH

  • “The material ledger told us where each tile came from and what it takes to keep clean. We swapped two finishes before ordering, and the budget held.”

    Dmytro BondarPodil, Kyiv54 m²9 weeksBand 900–980 K UAH

  • “Payment milestones matched the four build phases, so we always knew what we were paying for next. Site photos arrived weekly with area notes.”

    Iryna ShevchenkoHolosiiv, Kyiv112 m²21 weeksBand 2.1–2.4 M UAH

Individual experience, not a guarantee of results.

Request a scope sheet