Bands are typical ranges, not fixed prices; fees are quoted after survey. The figures on this page come from studio scope sheets on comparable Kyiv apartments and are listed per square metre, so you can test a band against your own floor plan before we meet.
04Cost bands
Bands below are typical ranges for apartments of 60 to 140 m² in Kyiv, recorded before the survey. Every row states the conditions we assume and what the band leaves out.
| Trade | Unit | Typical band | Conditions assumed |
|---|---|---|---|
| Demolition and strip-out | per m², UAH | 650–1,100 | Load-bearing walls, chimneys and screeds excluded. Debris carried to ground level. |
| Electrical rough-in and fit-out | per m², UAH | 1,200–2,100 | 12 to 18 points per 100 m², new cable runs, existing distribution board kept. |
| Plumbing and drainage | per m², UAH | 1,400–2,400 | Wet zones within 6 m of the existing risers. Riser replacement quoted separately. |
| Screed, plaster and levelling | per m², UAH | 900–1,600 | Wall deviation within 15 mm. External wall re-render not included. |
| Floor and wall finishes | per m², UAH | 1,100–2,800 | Mid-tier Ukrainian and EU materials. Natural stone and bespoke patterns excluded. |
| Joinery, doors and built-ins | per m², UAH | 1,800–4,200 | Door heights of 2.1 m, spray-finished carcasses, standard ironmongery. |
| Painting and decoration | per m², UAH | 450–900 | Two finish coats over surfaces prepared to a Q3 standard. |
Read how fees are set in the transparency notes, or book a site survey.
Choose the property type, the floor area in m² and the engagement level. The tool returns a cost band based on completed studio projects in Kyiv and the surrounding region.
Awaiting input
Estimate only, subject to survey. Bands are typical ranges, not fixed prices; fees are quoted after survey.
Bands on this page are typical ranges, not fixed prices. Fees are quoted after survey, and the scope sheet, cost band and material ledger reach you before demolition begins.
10% Retainer on signature. Reserves the design phase and the survey slot.
25% Design and permits, due when the drawing set is released.
30% Demolition and framing, due at rough-in sign-off.
30% Finishes and joinery, due at first fix completion.
5% Handover, due when the snag list is closed and signed.
Final quotes are issued after the measured survey, normally within ten working days. They replace the bands shown here and stay valid for 30 days. If site conditions change what the scope sheet describes, we issue a written variation before any extra work starts. Book a survey.